Case Study Plastics InstallAquatherm North America (NA) has published a fresh-off-the-press case study about how noncorroding Aquatherm Blue Pipe® saved the day by eliminating a plant’s future downtime. Because even a half-second loss in production time can cost an injection-molding facility tens of thousands of dollars, the stakes are high when it comes to replacing piping systems.

The Berry Global injection-molding facility in Lawrence, KS, had begun to incur losses because its existing carbon-steel piping was experiencing excessive corrosion; however, replacing 300 ft of welded steel in a manufacturing process that virtually never stops was not going to be easy. Add to that the project’s ever-shrinking installation window – down from three days to just 24 hours on Good Friday before Easter – and the mechanical contractor’s project manager had a challenge on his hands.

To find out how the project’s problems were solved and see photos of the piping installation, check out the Aquatherm website.

 

Media Contact

Barry Campbell
VP of Marketing

801-853-8169

Subscribe to E-Newsletter