![]() |
Hancock Medical Center, potable water and HVAC Bay St. Louis, MS 2011-2014 [multi-phase] After experiencing devastating damage from Hurricane Katrina, the Hancock Medical Facility was in dire need of renovation and a new piping system. |
![]() |
Mosaic Place Arena, HVAC and Domestic Water Distribution Moose Jaw, SK Spring 2011 A tight deadline required quick and easy installation on a large scale with LEED certification as a goal. |
![]() |
University of Southern Mississippi, HVAC Long Beach, MS Spring 2012 Tying a new building into the existing district energy plan through a buried pipe without disrupting roads, tennis courts, and the root system of a 500-year-old oak tree. |
![]() |
The Arbors at Baltimore Crossroads, HVAC and Domestic Baltimore, MD 2009-2013 (Multi-phase) Promoting sustainability and efficiency with a piping system that would not require open flames near the wood framing. |
![]() |
James H. Quillen VA Medical Center, Domestic Water Mountain Home, TN Winter 2010 The facility had experienced electrolysis problems in its domestic water supply system and needed to replace the lines with minimal disruption to patients and staff. |