    project

    SSM Cardinal Glennon Children’s Medical Center, Direct-buried Condensate Piping

    products used

    aquatherm blue

    location / date

    St. Louis, MO Winter 2010

    "The pipe material was more expensive than conventional material, but the process allowed less interruption to the hospital service and was several thousand dollars less expensive than the true excavation method."

    - Terry Banister, Rock Hill Mechanical Corporation (RHMC), St. Louis, MO

    aquatherm Advantages
    • The polypropylene pipe was able to withstand the high temperatures of the condensate
    • Since PP-R is chemically inert, no protective chemicals are necessary for the pipe – unlike steel
    • Returning the condensate to the facility at a higher temperature saves energy
  • project overview

    arrow_drop_down
    project

    SSM Cardinal Glennon Children’s Medical Center, Direct-buried Condensate Piping

    products used

    aquatherm blue

    location / date

    St. Louis, MO Winter 2010

    "The pipe material was more expensive than conventional material, but the process allowed less interruption to the hospital service and was several thousand dollars less expensive than the true excavation method."

    - Terry Banister, Rock Hill Mechanical Corporation (RHMC), St. Louis, MO

    aquatherm Advantages
    • The polypropylene pipe was able to withstand the high temperatures of the condensate
    • Since PP-R is chemically inert, no protective chemicals are necessary for the pipe – unlike steel
    • Returning the condensate to the facility at a higher temperature saves energy
Click anywhere to dismiss

The Challenge

A 650-foot steel condensate line had corroded completely and required a replacement that could withstand high temperatures without breaking down.

The Solution

A directional bore process was used to install Blue Pipe at the facility without disrupting the road or grounds.

SSM Cardinal Glennon Children’s Medical Center is a not-for-profit, 190-bed inpatient and outpatient pediatric medical center in St. Louis. The hospital is home to the Bob Costas Cancer Center, Dana Brown Neonatal Intensive Care Unit, St. Louis Fetal Care Institute, Dorothy and Larry Dallas Heart Center, St. Louis Cord Blood Bank, and the Missouri Poison Center.

Serving children locally and internationally, the hospital focuses on caring, commitment and excellence, and that focus carries over to its physical plant and facilities. The facility staff strives to ensure all systems are performing at their optimum levels.

In late 2010, the staff learned that the buried 650-foot, Schedule 40 carbon steel condensate line running from the Pediatric Research Institute to the main boiler room had completely corroded. The 2-inch low-pressure line had been installed approximately 20 years ago, and due to corrosion, had stopped returning condensate for re-use in the power plant.

KEEPING THE DRIVE ALIVE

Rock Hill Mechanical Corporation (RHMC), which is the mechanical contractor for Cardinal Glennon and works with other SSM facilities, was called in to help solve the problem. However, in order to replace the line, it was going to be necessary to tear up nearly 300 feet of concrete/asphalt, in addition to closing off the drive (a main thoroughfare).

The pipe material was more expensive than conventional material, but the process allowed less interruption to the hospital service and was several thousand dollars less expensive than the true excavation method.

– Terry Banister, Rock Hill Mechanical Corporation, St. Louis

Terry Banister, RHMC service manager, came up with a much more cost-effective plan of lining the existing pipe as opposed to excavating and removing the pavement and re-piping the line. Initially, high-density polyethylene (HDPE) was going to be used to line the steel pipe but there were concerns that the pipe would not be able to handle the high constant temperatures, which could exceed 180 ºF.

Coincidentally, the aquatherm distributor in St. Louis had just introduced RHMC to aquatherm Inc.’s polypropylene-random (PP-R) pipe systems, which are designed to handle constant temperatures of 180º.

A NEW/OLD SOLUTION

For nearly 40 years, aquatherm pipe systems and the simple heat fusion welding process have been proven in applications around the globe, and they are rapidly gaining acceptance in North America. aquatherm blue®, with an optional faser-composite layer hangs rigidly even when subjected to high operating temperatures (up to 200°) and reduces linear expansion of the pipe by 75% compared to other plastics. Fully recyclable, blue is designed specifically for HVAC and industrial applications and offers a natural insulation value of R-1 and excellent flow rates – translating into energy savings.

Banister said hospital staff had concerns about the high condensate temperatures breaking down the PP-R, which might have led to a premature failure of the pipe itself. Additionally, there were concerns about how to get the pipe underground using directional boring without pulling the pipe apart or damaging it during installation.

“What we did to resolve or reduce major concerns was to install a 5-inch HDPE carrier pipe to serve as a conduit during the directional boring process. This allowed us to assemble the pipe and pull it through the carry pipe without damaging the main pipe,” Banister explained.

The conduit also provided additional protection of the aquatherm pipe, allowing it to expand and contract without any worries of the pipe being damaged by any underground debris. This was a particular concern since old train tracks and other debris are known to be buried in the area.

The 2-inch blue was heat fused together above ground and then pulled through the HDPE conduit. The system was tested to 150% of the working pressure and held for four hours prior to putting the piping into service. Adding one more layer of protection to the system, RHMC added a couple sections of finned piping to the system before it exits the building to ensure the exit temperature would be 190º or less.

PP-R DELIVERS SAVINGS AND SATISFACTION

The overall project was completed in less than three weeks and the condensate now reaches the power plant at a temperature of 165°. The hospital saves resources by reusing the condensate, which takes much less energy to convert into steam than the much lower temperature municipal supply water.

It also saves cost since the system doesn’t require chemical treatment, and all parties are satisfied with this groundbreaking underground installation. The Cardinal Glennon power plant personnel monitored the water temperature and chemical levels for the first couple of weeks and were very satisfied with the outcome.

“The pipe material was more expensive than conventional material, but the process allowed less interruption to the hospital service and was several thousand dollars less expensive than the true excavation method,” Banister concluded. Additionally, thanks to the energy savings, the new condensate line will pay for itself quickly while the PP-R system should function for decades to come.

Related Case Studies

The Data are In: ‘Hyperscale’ Data Center Selects Reliable Aquatherm Pipe

aquatherm blue plays a key role in ensuring the data in the new Novva “hyperscale” data center stays cool and secure.

View Case Study

POLYPROPYLENE PIPING PERFECT FOR PREFABBED PLUG-AND-PLAY ‘PODS’

Thanks to its light weight, ability to be custom-fabricated off site, and availability as Revit files, aquatherm pipe is an integral part of Harvey Plumbing & Heating’s modular mechanical room “pods.”

View Case Study

AQUATHERM HELPS GROWING HOSPITAL REACH FOR THE (BIG) SKY

aquatherm blue® and aquatherm green® will handle chilled and domestic water at three-story ICU expansion

View Case Study

AQUATHERM PIPE BRINGS NEW LIFE TO SOUTHERN LANDMARK

A contractor’s first installation of aquatherm brings 21st century pipe to a 1925 structure

View Case Study

arrow_upward