GREEN PIPING ALTERNATIVE EXCELS IN ARIZONA MEDIA BUILDING
Blue Pipe was installed to provided labor savings and eased installation.
Click anywhere to dismiss
The Challenge
New 4-inch main and 3-inch supply lines were required in tight spaces to serve WHSP and chiller units for the data center and A/C system.
The Solution
Blue Pipe was installed to provided labor savings and eased installation.
“The installation lasted approximately two weeks. If this had been a steel pipe installation it would have been three to four weeks to cut and thread pipe this size and then deal with weight issues.”
-Jay Faraci, Owner of Metal Masters Mechanical LLC, Phoenix