ILLINOIS’ OLDEST SCHOOL GOES FROM "H" TO "HVAC" WITH PP-R - Aquatherm

ILLINOIS’ OLDEST SCHOOL GOES FROM “H” TO “HVAC” WITH PP-R

aquatherm’s polypropylene-random (PP-R) pipe provided a safe, quick installation along with significant labor and material savings.

  • project overview

    arrow_drop_down
    project

    Peoria High School, HVAC

    products used

    aquatherm blue

    location / date

    Peoria, IL

    "The training was pretty quick and easy. The learning curve was not as steep as I thought it would be. After a couple of days of using it, they were pretty proficient at it."

    - Greg Cicciarelli PIPCO Executive V.P.

    aquatherm Advantages
    • The speed of fusion connections versus welding and soldering allowed the construction team to meet a very tight deadline.
    • Using aquatherm for the domestic plumbing system saved the district $22,000, plus $28,000 related to pipe insulation.
    • Using aquatherm to connect the heat pump system allowed the contractor to offer $30,000 in overall value engineering savings.
  • project overview

    arrow_drop_down
    project

    Peoria High School, HVAC

    products used

    aquatherm blue

    location / date

    Peoria, IL

    "The training was pretty quick and easy. The learning curve was not as steep as I thought it would be. After a couple of days of using it, they were pretty proficient at it."

    - Greg Cicciarelli PIPCO Executive V.P.

    aquatherm Advantages
    • The speed of fusion connections versus welding and soldering allowed the construction team to meet a very tight deadline.
    • Using aquatherm for the domestic plumbing system saved the district $22,000, plus $28,000 related to pipe insulation.
    • Using aquatherm to connect the heat pump system allowed the contractor to offer $30,000 in overall value engineering savings.
Click anywhere to dismiss

The Challenge

The aging yet sturdy Peoria High
School required a retrofit of the pipe
system in tight spaces without the
use of welding torches

The Solution

aquatherm’s polypropylene-random
(PP-R) pipe provided a safe, quick
installation along with significant
labor and material savings

This $6 million retrofit involving miles of PHVAC pipe had to be completed during summer break, but an experienced construction team met the tight deadline using aquatherm’s heat-fused polypropylene-random pipe and other cutting-edge technologies.

With a rich history dating to the mid 19th century, Peoria High School is commonly referred to as “Central” due to its location and to distinguish it from two other Peoria high schools. As the oldest continually running high school in Illinois, the four-story, nearly 300,000-sq-ft building was built in 1916, with additions in 1961.

In winter 2011, district officials began planning an ambitious project that would add a new science wing and gymnasium/locker room to the nearly century-old facility. The scope of work also included replacing the entire steam heating system and adding ventilation and air conditioning.

“GOOD BONES”

According to Peoria Central Building Engineer Rick Powers, the investment in the building made sense since its “bones” are solid, it’s centrally located, and with the expansion, is able to meet future needs. “We hadn’t been updated since 1961 so it was time for some pretty considerable upgrades.”

The Peoria Public Building Commission and Peoria School District 150 hired the Farnsworth Group, Inc. (Normal, IL) to handle the project’s design work. Farnsworth, an award-winning, nationwide firm, has earned a reputation for energy efficient, reliable, durable, and successful building design.

One of the most challenging aspects of the project was that the entire job – including demolition, installation, and commissioning – needed to be completed during a school calendar summer. According to D. Edwin Lind, P.E., Engineering Manager with Farnsworth, “the old steam system, including the old gas-fired steam boilers, piping, and terminal units, needed to be removed and the new system installed during the summer – June, July and most of August. The fall semester began the last week of August.”

The project called for miles of piping and the original specifications included black steel and copper for the smaller diameter piping to be located in the chases. Lind explained that although threaded fittings could be used to eliminate the need for welding torches in the aged facility, the weight of the black steel was going to make the installation challenging in tight spaces.

“The copper tubing, albeit lighter, required an open torch for soldering joints. After the piping was installed in the chases and tested, the greatest concern was repairing or replacing leaking joints,” he added.

THE RIGHT PRODUCT AT THE RIGHT TIME

Coincidentally, The Pipco Companies, Ltd., (PIPCO) had recently become an approved installer of the German-manufactured aquatherm polypropylene-random pipe (PP-R), and proposed using the proven, yet relatively new-to-North America option. PIPCO won the mechanical contracting bid on the job for installation of the heat pump loop water piping in the building’s existing vertical chases.

Established in 1958, PIPCO is a full service contracting firm with expertise covering M/E/P and a huge range of construction services. The 2nd generation, Peoria-based company is one of the most complete performance contractors in downstate Illinois and is known for providing high quality, cost-effective solutions.

PIPCO Executive Vice President Greg Cicciarelli explained that aquatherm’s local distributor, Columbia Pipe & Supply Co., had presented the PP-R pipe system to PIPCO roughly a year earlier. “We looked at the product at that time but we didn’t have anything we could use it on then. We liked it, but needed the right opportunity and Peoria was the right project for our use.”

Despite aquatherm not being in the specification, PIPCO was able to bring the heat-fused pipe system onto the job through value engineering. “The owner made the decision to use aquatherm because of the value engineering cost savings that could be realized and because of the warranty associated with the product,” Cicciarelli said.

“The fusion bonding of aquatherm eliminated potential problems with the pipe leaking once it was sealed up in the chases, and the piping itself was lightweight and generally easier to handle in confined conditions,” Lind explained.

While Lind and his associates initially had concerns about the joining process of the piping, expansion factors, pressure ratings, and temperature ratings, he recalled that all of these were adequately addressed by the manufacturer’s representative, Skip Newton with PVF Solutions, and the contractor.

aquatherm uses heat fusion to form connections, a process often used in natural gas piping because of its reliability. Heat fusion bonds both sides of a joint into a single, homogenous material without the use of chemicals or mechanical connections, which eliminates systematic weaknesses and fail-points in the pipe. The seamless heat fusion connections do not require an open flame or burn permit like soldering does (the heating iron, which reaches 500 ºF, is plugged into a standard 110V outlet).

LOSING THE FLAME

Lind explained that the safety benefit offered by heat fusion was “definitely a consideration in a building of this age and the confined spaces where the piping was being installed.” Additionally, when installed by aquatherm-trained and certified technicians (all PIPCO plumbers and pipe fitters were certified), the pipe and fittings carry a 10-year, multi-million dollar warranty covering product liability, labor, personal injury and property damage.

Lind said the warranty, which is basically an insurance policy issued by Zurich Insurance, was a factor in aquatherm being used on the job since the piping installed in the vertical pipe chases could not be easily repaired or replaced. aquatherm blue® (formerly blue®) was used in diameters ranging from 10-in. mains (with 4-, 6- and 8-in. branches) in the boiler room down to ½-in. lines running to ClimateMaster® heat pumps in varying sizes.

Cicciarelli said it was tough getting into some of the tight spaces. “One challenge was with the bigger sizes of pipe and getting the welding machine up into those. We basically figured out ways of getting more access to the space and had to move stuff out of the way or had to use additional manpower and extra muscle, but it would have been challenging with metal too.”

A benefit of using the lighter weight PP-R, Cicciarelli said, was that one installer could pull or lift 3-in. or 6-in. pipe through small tunnels that were between four and five feet high. Also, the smaller pipe could be maneuvered through small chases and around beams in walls due to its flexibility compared to metal.

Using aquatherm pipe to connect the heat pump system allowed PIPCO to offer the school district $30,000 in overall value engineering savings. “These savings included the additional costs associated with enclosing any exposed piping,” explained Cicciarelli.

DON’T FORGET THE DOMESTIC!

Peoria-based Tobin Brothers Mechanical, a full service plumbing company specializing in general plumbing and drain systems, irrigation, and sewage, won the bid for the domestic water system upgrade and performed the entire installation. According to Lind, using aquatherm for the domestic plumbing system saved the district $22,000, and another $28,000 was saved due to reduced or unneeded pipe insulation on the domestic cold water system.

Also, since the operating temperatures of the loop system fell within aquatherm’s recommended tolerances, insulation was unnecessary except for aesthetic reasons. These insulation labor and material savings factored heavily into the overall savings on the project.

TRAINING AND INSTALLATION

Columbia Pipe served as the distributor on this project, with PVF Solutions serving as a facilitator. With close to one million square feet of warehouse, Columbia Pipe has 20 mutually supporting locations in Illinois, Indiana, Michigan, Wisconsin and Minnesota, and has carried aquatherm since 2010.

Columbia and PVF Solutions’ Newton set up an aquatherm factory training session for the PIPCO superintendent and foremen, who were certified at the PIPCO shop prior to the start of the job. The foremen then trained and certified the journeymen under them on the jobsite. “The training was pretty quick and easy,” Cicciarelli recalled. “The learning curve was not as steep as I thought it would be. After a couple of days of using it, they were pretty proficient at it.”

At the peak of the installation, PIPCO had five foremen each overseeing a crew of between 5-10 installers. Cicciarelli said that the when the 6,000-plus linear ft of aquatherm was pressure tested there were minimal leaks. “And those leaks had more to do with the craftsmen not being familiar with the system than poor workmanship. They were standard problems and they were minimal,” he explained.

CRUNCH TIME

The tight time frame of the job made things very interesting. According to Cicciarelli, the key aspect of the PP-R system that fit so well on this job was that this was a $6 million retrofit that had to be completed in two and a half months.

“We felt the labor time savings with the product would help meet that schedule. And, yes, it did bear that out. Our superintendent felt the use of the system was definitely beneficial. If we’d used copper and steel [soldered copper up to 2-in. and welded steel 2½-inch and above], we’d have gone over in labor because of overtime.”

In only 63 days, the entire job was complete and the team had the systems operational for the start of the 2012 school year. “They were working two shifts and sometimes three. And they met the deadline. With this new piping system I was surprised how fast it could go versus welded iron or galvanized. It was amazing,” said Peoria Central’s Powers.

Related Case Studies

The Data are In: ‘Hyperscale’ Data Center Selects Reliable Aquatherm Pipe

aquatherm blue plays a key role in ensuring the data in the new Novva “hyperscale” data center stays cool and secure.

View Case Study

POLYPROPYLENE PIPING PERFECT FOR PREFABBED PLUG-AND-PLAY ‘PODS’

Thanks to its light weight, ability to be custom-fabricated off site, and availability as Revit files, aquatherm pipe is an integral part of Harvey Plumbing & Heating’s modular mechanical room “pods.”

View Case Study

AQUATHERM HELPS GROWING HOSPITAL REACH FOR THE (BIG) SKY

aquatherm blue® and aquatherm green® will handle chilled and domestic water at three-story ICU expansion

View Case Study

AQUATHERM PIPE BRINGS NEW LIFE TO SOUTHERN LANDMARK

A contractor’s first installation of aquatherm brings 21st century pipe to a 1925 structure

View Case Study

arrow_upward